1 00:00:10,870 --> 00:00:09,030 nasa's constellation program is a step 2 00:00:12,709 --> 00:00:10,880 closer to the first test flight of the 3 00:00:14,549 --> 00:00:12,719 vehicle that will send humans on their 4 00:00:16,230 --> 00:00:14,559 way to the moon 5 00:00:19,750 --> 00:00:16,240 hardware that will be used for the test 6 00:00:21,990 --> 00:00:19,760 flight of ares 1x was delivered by a c5 7 00:00:26,550 --> 00:00:22,000 aircraft to kennedy space center's 8 00:00:28,150 --> 00:00:26,560 shuttle landing facility in january 2009 9 00:00:30,550 --> 00:00:28,160 the equipment consisting of a 10 00:00:32,950 --> 00:00:30,560 meticulously engineered simulated crew 11 00:00:34,870 --> 00:00:32,960 module and launch abort system was 12 00:00:37,270 --> 00:00:34,880 carefully unloaded from the belly of the 13 00:00:40,229 --> 00:00:37,280 enormous aircraft 14 00:00:42,229 --> 00:00:40,239 the launch abort system simulator is 46 15 00:00:44,709 --> 00:00:42,239 feet in length and will fit over the 16 00:00:47,190 --> 00:00:44,719 crew module and tower above it forming 17 00:00:49,190 --> 00:00:47,200 the nose of the vehicle 18 00:00:51,830 --> 00:00:49,200 two flatbed trucks transported the 19 00:00:53,910 --> 00:00:51,840 hardware to high bay four of kennedy's 20 00:00:55,990 --> 00:00:53,920 vehicle assembly building 21 00:00:57,830 --> 00:00:56,000 inside the massive building workers 22 00:01:00,549 --> 00:00:57,840 removed the protective blue cover from 23 00:01:02,630 --> 00:01:00,559 the simulated crew module this hardware 24 00:01:05,830 --> 00:01:02,640 and other elements will be integrated 25 00:01:06,950 --> 00:01:05,840 into the full-scale ares 1x test launch 26 00:01:09,830 --> 00:01:06,960 vehicle 27 00:01:12,550 --> 00:01:09,840 kennedy's launch pad 39b will be the 28 00:01:15,109 --> 00:01:12,560 site of the first aries 1x test flight 29 00:01:17,670 --> 00:01:15,119 targeted to launch in 2009 30 00:01:20,390 --> 00:01:17,680 an important step toward developing ares